Resorts
How the work is organised
A resort project usually starts with the suites and the covered terraces, so the material palette can be settled for the rooms guests use most before it is extended to the rest of the site. Tilesco then works through the suites, outdoor areas and shared spaces, keeping the same floor, wall and joinery language throughout, and checking that changes in material happen at a threshold or a natural break rather than in the middle of a room. Samples are reviewed against the plan and against the light in each space, including covered outdoor areas, so a finish that works indoors still works where it meets the outside.
What is included
The scope can cover floor and wall tiles, stone and timber-look surfaces, sanitary ware and fittings, doors and joinery, wardrobes and storage, lighting and hardware, and the trims and thresholds that join indoor and outdoor areas. For bathrooms and covered terraces, the selection also covers the build-up beneath the visible finish, including waterproofing and drainage details that need to be agreed with the builder before work starts. Each item is listed by suite and by area, so the client can see what is included, what is still to be confirmed, and where a finish is repeated to keep the resort feeling consistent.
How the client works with us
Clients usually share floor plans, room dimensions, reference images and any finishes already chosen, and tell us which suites matter most and when the work needs to start. Tilesco then prepares a schedule by suite and by area, together with a set of samples for review, and updates the schedule as choices are confirmed. Before delivery, the client checks the final schedule, delivery address and access arrangements, and confirms the order in which suites and areas will be handed over, so materials arrive in the sequence the site needs them.